A kitchen remodel is a project with many moving parts. Knowing the order of work, and planning for weeks without a kitchen, makes it much easier.
Plan before demolition
- Set your budget and contingency.
- Decide on the scope: refresh, same layout, or new layout.
- Choose your remodeler or designer.
- Finalize the design, including cabinets, counters, appliances, sink, faucet, lighting, and tile.
- Order materials, especially cabinets and appliances, which can take weeks.
- Get permits.
The typical order of work
- Demolition
- Structural changes, if any
- Rough-in plumbing, electrical, gas, and ventilation
- Inspections
- Insulation and drywall
- Flooring (sometimes after cabinets)
- Cabinets
- Countertop templating
- Countertop fabrication and installation
- Sink, faucet, and appliance hookup
- Backsplash
- Lighting, paint, and trim
- Final inspections and punch list
Living without a kitchen
Set up a temporary kitchen somewhere else in the house:
- Refrigerator, microwave, coffee maker, and toaster oven
- An electric skillet, slow cooker, or air fryer
- A folding table for prep
- Paper plates and a dishpan for washing in a bathroom or laundry sink
- Use the grill on nice days
Plan easy meals, and budget for some eating out.
Dust and safety
- Ask how the remodeler will contain dust.
- Protect floors and nearby rooms.
- In homes built before 1978, lead-safe work practices are required.
- Keep kids and pets away from the work area.
Communication
- Agree on how and how often you'll get updates.
- Put all changes in writing with change orders.
- Keep a list of questions for site visits.
The bottom line
Order early, expect several weeks without a kitchen, and set up a temporary kitchen before demolition. See how to choose a kitchen remodeler.